Feed-mill construction
Site readiness, civil and utility interfaces, local approvals, installed scope and commissioning records.
Read the construction guide →For integrators, cooperatives and feed manufacturers planning a new feed mill or a capacity expansion. Size the mill from the tonnage you need, put every supplier on the same written scope, and compare offers on one basis. FeedMatch is supplier-neutral: it does not sell or build equipment and does not lend money.
Project requests start at USD 250,000. A person reviews every request before any supplier or financier is contacted.
Short answer: start from how much feed your animals use and how often it can be delivered, then choose bulk feed storage and any on-farm grinder-mixer to fit that need. Use the free calculators below first, then request comparable proposals. Buyer tools are free, with no obligation to order.
Size feed bins and silos from your peak daily feed use, the days of cover you need between deliveries and a safety stock, then check bulk density so tonnes convert correctly to bin volume. Ask suppliers for bin capacity in both cubic metres and tonnes of your feed type.
Before comparing grinder-mixers, write down the feed your nutritionist has approved, batch size, ingredients and how they arrive, and your available power. Compare quotes on the same scope: installation, weighing, guarding, dust control, training and spares.
Keep each batch traceable from delivery to use, protect feed from moisture and pests, and plan cleaning access. Your storage plan and records matter as much as the equipment itself.
Define saleable output by species and product form before selecting machines. Quote the same intake, grinding, mixing, pelleting or extrusion, utilities and commissioning boundaries. A nominal machine rating is not an accepted production-line capacity.
| Decision / unit | Buyer basis to send | Evidence to request |
|---|---|---|
| Finished-feed capacity · metric t/h | Required tonnes ÷ productive hours in the same period. One metric tonne = 1,000 kg; deduct downtime once. | Product-specific sustained output, recipe/physical specification, run duration and utility conditions. |
| Daily-to-hourly conversion · t/day → t/h | Illustration only: 240 t/day ÷ 16 productive h/day = 15 t/h; at 24 productive h/day = 10 t/h. Neither is a supplier rating or a recommendation. | Confirm whether daily output refers to calendar hours or actual production hours; check each product separately. |
| Raw-material intake · t/h and usable tonnes | Unload tonnes ÷ available unloading hours. State delivery windows, sampling/lot-release holds and segregated storage needs. | Intake and conveying rates on the specified materials; usable storage, density basis and dust-control interfaces. |
| Grinding / mixing / pelleting | Buyer-approved particle-size and mixing tests, batch size/cycle, feed form, conditioning and cooling boundaries. | Test methods and instruments; product-specific capacity and quality criteria agreed before contracting. Nutritionist approval remains separate. |
| Retrofit / energy · kWh/t | Measured electricity kWh ÷ accepted finished tonnes over the same period and system boundary. Report steam/fuel separately. | Retained equipment condition, shutdown window, before/after product mix, load and meter boundaries. No assumed savings. |
| Installed bid · stated currency | Separate machines, civil works, silos, utilities, installation, freight/duty, commissioning, training and spares. | Same inclusions/exclusions, Incoterm/place, currency/date, tax basis and payment milestones; unknown items stay unresolved, not zero. |
Ask the buyer’s competent engineer to define dust collection, housekeeping access, isolation/lockout, hot-work controls and fire/explosion-risk responsibilities under applicable local rules. Agree factory/site acceptance tests (FAT/SAT), representative materials, throughput/quality measurements, training, manuals, control backups and an outstanding-defects register. This checklist is not a safety design or a compliance certificate.
FeedMatch is human-led and supplier-neutral, not an OEM, EPC contractor or engineering approver. Plant/equipment requests from US$250,000 receive project-specific review; no quotation, availability or performance is guaranteed. Separate ingredient/feed supply is assessed by specification, viable volume/frequency, destination and logistics—not that capital-project minimum.
Send species, metric t/h, mash/pellet/extruded form, site country, greenfield or retrofit, process scope, budget band and timeline. Consent is required before sending contact details.
Technical references checked 18 October 2026. OSHA is US-specific, not a statement of Saudi or global compliance. FAO/IFIF (2020) · OSHA 29 CFR 1910.272
A feed mill prepares animal feed from ingredients through defined receiving, storage, grinding, dosing, mixing and product-finishing stages. A complete-plant brief must separate the equipment line from engineering, site works, utilities, installation and acceptance responsibilities.
Capacity means throughput under stated product and operating conditions: tonnes/hour for a process line is not tonnes/month purchased, annual demand or animal numbers. These are buyer requirements, not FeedMatch capacity or performance claims.
Plant/equipment projects retain the USD 250,000 qualification. Our team reviews requests before supplier outreach. This checklist is not inventory, an engineering design, certification or a promise of quotes; availability and country coverage require confirmation against your brief. Free planning does not require an account.
Links do not send a request. Share contact details only with the existing form’s consent; our team manages supplier communication. Keep private formulas and sensitive documents out of public planning links.
Technical background: FAO / IFIF, Good practices for the feed industry (2010) and FAO, Fish Feed Technology (1980), chapters on feed manufacturing. Sources contextualize processes; they do not establish supplier qualification or destination compliance. Editorial review: 18 October 2026.
For equipment preparing feed for your own animals, not industrial factory construction: funding decisions, installation readiness and named operating responsibilities.
Define the facility, production line and ingredient requirements together before our team prepares a comparable RFQ.
Site readiness, civil and utility interfaces, local approvals, installed scope and commissioning records.
Read the construction guide →Ration-specific capacity, conditioning, cooling, dies, wear parts and measurable acceptance criteria.
Read the pelletizing guide →Approved specifications, lot evidence, delivery schedules, receiving limits and comparable landed costs.
Read the procurement guide →Private project brief
Share the planned site, feed types, target capacity, process route, budget band and timeline. FeedMatch uses the brief to prepare a comparable supplier request; it is not published as a public listing.
Projects start at US$250K. A person reviews every project before any manufacturer, supplier or financing partner is contacted.
A useful brief fixes product, throughput, site interfaces and delivery scope before offers are compared. Buyers supply the figures; providers explain assumptions, exclusions and evidence on that same basis. Reviewed October 13, 2026.
New mill, expansion or retrofit; country and site, intended species and feed forms, buyer contact and decision stage, budget basis and requested schedule. B2B equipment/capital projects start at USD 250,000 and require human review before outreach.
Buyer-entered tonnes/hour, annual output, shifts, operating days, batch size and product mix. Identify the constrained stage and existing equipment. Distinguish nameplate capacity from scenario output; do not infer a formula or utilization rate.
Approved formula envelope, ingredient identities and units, physical product dimensions, lot/COA and testing requirements, packaging and acceptance method. A qualified nutritionist and process engineer set technical criteria; preliminary calculator output is not a production formula.
Layout and available footprint, intake/storage/dispatch, utilities and power, conveying interfaces, automation and software integration, civil works and local permit responsibilities. State included, excluded and optional work; specialists assess engineering and safety.
Currency, quote validity, Incoterm and named place, freight, duties, storage and handling if known; delivery, installation, commissioning, training, warranty and spare parts. Require the same scope and test basis across responses, with all deviations visible.
Record usable storage, current stock, lot segregation, delivery lead times and seasonal demand peaks. Annual-average capacity alone does not size peak periods. Assign owners and dependencies to site readiness, permits, delivery, installation and commissioning dates; mark unconfirmed dates as pending.
Buyer procurement is free. The buyer creates the brief. FeedMatch checks scope and project fit before supplier outreach, organizes comparable responses and coordinates next steps. Provider questions go through the team; private buyer contacts and formulas are not an open lead list. No direct buyer-manufacturer connection or guaranteed RFQ. Only after the project and comparable proposals are defined may the buyer request optional external financing review with consent. FeedMatch is not a bank, lender or credit adviser; no financing, terms or returns are guaranteed, no Rabobank partnership is verified and no lead is automatically sent to a bank.
Every result uses only the figures you enter. The tools do not supply prices, rates or supplier quotes.
Plan capacity, grinding, mixing, pelleting and storage with editable assumptions and visible formulas.
Open the calculator →Enter your own project cost, equity share, rate and term to see the loan amount and repayment schedule.
Open the calculator →Add up the equipment, civil works and installation figures from your own quotes on one basis.
Open the calculator →Turn annual finished-feed demand and operating hours into the tonnes per hour the mill must deliver.
Open the calculator →
Short answer
Before you ask anyone for a machine price, write down the measurable result the mill must deliver: tonnes per hour of a named product, consistent pellet quality, less rework and fines, and a known energy and cost per tonne. Measure today's baseline for each one.
Then compare three paths on the same numbers — improve the existing line, expand it, or build a new line — and only after choosing a path turn it into one written scope that every supplier quotes. FeedMatch helps buyers do this for projects of USD 250,000 and above, free of charge, and contacts suppliers on your behalf after a person has reviewed the request.
How this guide was made: the structure, formulas and examples were drafted with AI assistance and checked against the cited sources and the calculators on this site. They have not been reviewed for your specific mill by an engineer. A FeedMatch team member reads every submitted request, but that is a procurement review, not an engineering sign-off.
Fill the baseline from your own records before you talk to suppliers. Targets come from your customers, your sales plan or your own specification — not from this page.
| Outcome | Baseline (today) | Target | How to measure |
|---|---|---|---|
| Throughput (t/h) | Tonnes produced ÷ running hours, per recipe, over at least four weeks | Required t/h from the calculator below for your demand and shifts | Weighbridge or bagging-line counts divided by logged running hours; state the product and die |
| Pellet durability | Durability test results per recipe | Your customers' or your own quality specification | Tumbling-box durability test (ASABE S269 method) on samples taken after the cooler |
| Mixing uniformity | Coefficient of variation (CV) from a marker test | Your own CV limit for the products you make | Marker or salt test on a set of samples from one batch, repeated after any mixer change |
| Pellet temperature and moisture after cooling | Probe readings at the cooler outlet | The limit your storage and customers require | Temperature probe and moisture test at the cooler discharge, per recipe |
| Fines, rework and waste (%) | Rework and rejected tonnes ÷ total output | A lower figure you set from your own records | Screen returns, rework bin and reject logs reconciled each month |
| Energy per tonne (kWh/t) | Electricity meter readings ÷ tonnes, per section if sub-metered | A lower figure you set from your own records | Monthly meter readings for grinding, pelleting and the whole site divided by tonnes produced |
| Uptime (%) | Running hours ÷ scheduled hours | The uptime your capacity plan assumes | Shift logs with every stop and its cause |
| Conversion cost per tonne | Energy, labour, maintenance and consumables ÷ tonnes | The cost your business plan needs | Monthly accounts divided by tonnes produced, excluding raw materials |
| Feed conversion on the farm (where relevant) | FCR from flock or herd records | Set by your nutritionist and farm team | Farm records over full cycles; many factors besides the mill affect FCR, so treat it as a shared outcome |
Answer these in writing. They become the first page of your RFQ and stop suppliers quoting different assumptions.
Use the same baseline numbers for all three columns. The right answer depends on your measurements and quotes, not on a general rule.
| Question | Improve the existing line | Expand (add or replace a section) | New line or new mill |
|---|---|---|---|
| When it usually fits | Output is close to demand and losses come from stops, rework or one weak setting | One section limits the whole line and the rest has spare capacity | Demand is far above what the site can reach, or the site, building or utilities cannot be extended |
| What to measure first | Uptime, rework, quality results and energy per tonne | The t/h of each section, to find the lowest one | Required t/h, site constraints and utility capacity |
| Typical scope to quote | Controls, maintenance, dies, conditioning or cooler adjustments, sub-metering | The limiting section plus its utilities and connections | Full process line, storage, utilities, civil works, installation and commissioning |
| Downtime during the work | Usually short or planned into maintenance stops | A planned shutdown for the tie-in | The existing mill can keep running until start-up |
| Main risk | Fixing symptoms while the real bottleneck stays | The next section becomes the new limit | Larger budget, longer timeline and ramp-up period |
| Calculator to use | Energy and bottleneck calculators | Bottleneck and capacity calculators | Capacity, cost, TCO and financing calculators |
A machine price is paid once; feed quality, throughput, energy, maintenance and downtime are paid every tonne. Compare offers on cost per tonne over the years you will own the line, using the supplier's own stated figures and your measured baseline.
| Cost line | What to ask each supplier for | How to compare |
|---|---|---|
| Purchase price and scope | Itemised price and a written list of exclusions | Add excluded items (installation, steelwork, utilities) before comparing |
| Rated throughput | t/h on your named product, die and recipe | Divide yearly costs by the tonnes the line can really make at that rate |
| Energy per tonne | Installed kW and expected kWh/t on your product | kWh/t × yearly tonnes × your electricity price |
| Wear parts and maintenance | Die, roller, hammer and screen life and their prices | Yearly parts and labour cost ÷ yearly tonnes |
| Downtime | Planned maintenance hours and spare-parts lead times | Lost hours × your contribution per hour |
| Feed quality | Durability, mixing and cooling results the supplier will test at acceptance | Rework and rejects × your cost per tonne |
| Payment terms and warranty | Milestones, retention, warranty scope and length | Cash needed at each stage; who pays for failures |
Fill the comparison with each supplier's written figures; FeedMatch adds no prices or performance claims. The TCO calculator does the arithmetic. TCO →
The $1 million in this title is only an illustration — not a quote, a typical cost or a minimum (FeedMatch project requests start at US$250,000). Short answer: measure the outcome gap first, find the one constraint that limits the whole line, and only then compare fixing the existing line, expanding it, or building a new mill on the same cost-per-tonne basis over the same period.
Gap (t/h) = required t/h − measured t/h of the bottleneck step. Required t/h = annual tonnes ÷ (days × hours × uptime). If the gap closes by removing one bottleneck, fixing usually beats expanding; if every step is near its limit, compare expansion with a new line.
Enter your own estimates or supplier figures for each option. Results are simple and undiscounted: total cost = investment + downtime loss + extra operating cost × years; payback = (investment + downtime loss) ÷ (extra tonnes × margin per tonne − extra operating cost). Nothing is saved or sent.
No. It is only a headline example. FeedMatch project requests start at US$250,000, and real costs depend on your scope and supplier quotes.
When one step, poor uptime or quality loss explains most of the gap to target t/h, and the rest of the line has spare capacity.
When power, steam, intake, space, permits or building condition prevent the target, or when the expansion's cost per tonne over the same period is higher.
Use the same period, the same tonnes and your own cost per tonne, include downtime during installation, and compare quotes written against one scope.
It gives a simple undiscounted payback and net result from your figures. For a full return on investment, add discounting, tax and financing cost with your adviser.
Throughput on named products, pellet durability by ASABE S269, mixer CV, energy per tonne and a test duration, at the factory (FAT) and on site (SAT).
No. You decide. FeedMatch's team turns your chosen scope into one request, contacts suitable suppliers and presents organized responses. The service is free for buyers.
Limits: this scorecard ignores discounting, tax, inflation and financing cost, and uses only the figures you enter. It was drafted with AI assistance and has not been reviewed by an engineer for any specific mill. FeedMatch compares supplier quotes; it does not build, sell or finance mills.
Enter your own figures. The result is arithmetic only — it is not a design, a quote or a supplier rating.
Formula: t/h = annual tonnes ÷ (days × hours × uptime). kWh/t and cost/t divide your yearly totals by the same annual tonnes.
Assumption: a mill must supply 60,000 tonnes of pelleted feed per year, running 300 days, 16 hours per day, with 85% uptime.
Effective hours = 300 × 16 × 0.85 = 4,080 hours. Required throughput = 60,000 ÷ 4,080 ≈ 14.7 t/h of that pelleted product.
If the line today produces 12 t/h on the same product, the gap is about 2.7 t/h. Before pricing a new line, check whether the gap comes from uptime (stops), from one section, or from the whole line — each points to a different column in the matrix.
These figures are an example to show the method, not a benchmark for any mill. No prices are given because they depend on your scope, site and suppliers.
Send your baseline, target and chosen path. A person reviews every request of USD 250,000 or more before any supplier is contacted, and then presents the organized responses to you. Free for buyers.
Start a feed mill project requestSources
Write down what the mill must produce: species and feed types, mash or pellets (or extruded feed), raw materials and how they arrive, and where the supplier's work ends. Without a written scope, one supplier quotes the process line only while another includes buildings and silos, and the prices can't be compared.
Convert annual finished-feed demand into tonnes per hour at your planned shifts and operating hours, and say which product the rate refers to. Pelleting rates usually differ by recipe and die, so ask each supplier to state the product and conditions behind its rated capacity. Note any expansion you expect later so the layout and utilities allow for it.
Put every offer into the same table: machine list and models, motor power, automation level, what is excluded, delivery terms (Incoterms), payment milestones, warranty, spare parts and commissioning support. Ask in writing about any line one supplier includes and another leaves out, rather than guessing.
Lenders and leasing companies usually ask for the project budget, the share you fund yourself, supplier quotes, a business plan with feed demand and the security offered. Use the financing calculator with your own rate and term to test repayments before you talk to a lender. FeedMatch does not lend money or promise approval.
Send the scope, capacity, site country and budget range through the request form. Projects start at USD 250,000, and a person reviews every request before any supplier or financier is contacted.
No prices are given here: costs depend on your scope, site and suppliers. Check that each quote shows these items separately or clearly excludes them.
Choose the route by responsibility, not the brand name: a directory helps discover options, an equipment manufacturer supplies its own scope, and a managed procurement brief lets the review team organise requests on one buyer-defined basis. None of these roles alone proves engineering fitness, supplier availability or an open project budget.
| Route | Use it for | Buyer must confirm |
|---|---|---|
| Directory or exhibition network | Discovering companies and product categories | Who contracts, what is supplied, and whether the specific scope is available |
| OEM or plant integrator | A manufacturer's technical proposal and its defined interfaces | Included/excluded works, retained equipment, local approvals and acceptance responsibility |
| Feed producer or ingredient seller | Buying a specified feed product or ingredient | Lot evidence, delivery quantity/frequency and destination admissibility; not a plant proposal |
| Managed supplier-neutral request | Organising comparable responses against the buyer's written brief | Human review first; no guaranteed quotation, engineering approval or supplier access |
For expansion, state additional vendable tonnes per period and product-specific operating hours. For modernization, document the measured bottleneck, condition of equipment retained, utility limits and allowable shutdown. Neither an announced investment nor a nominal t/h rating proves that a purchasing package is still open. Compare the full grinding, mixing, pelleting/extrusion, drying and storage interfaces before selecting one machine.
Use metric tonnes (1,000 kg). Required sustained t/h = vendable tonnes in the period ÷ productive hours in that period; deduct downtime once, and test each product separately. Unknown installed-cost items remain unresolved, not zero.
Process/safety context: FAO/IFIF, Good practices for the feed sector (2020); reviewed 18 October 2026. Route comparison is a buyer checklist, not an assessment of any named company's quality or commercial terms.
Many buyers start from one brand's pellet mill, extruder or turnkey line. That is a useful reference, but a single catalog sets the configuration before the outcome is defined. Before asking for one vendor's price, write down what the line must achieve, so any supplier can quote the same scope:
You can name the model you are considering in your request. Our team uses it as a reference and asks suitable suppliers to quote the same scope. We do not pass your contact details to manufacturers.
Published bank research, summarized as planning context. These are not FeedMatch forecasts, and FeedMatch is not affiliated with Rabobank.
Feed formulation tool: select ingredients, compare inclusion costs and measured FCR →
Short answer: define the site, construction responsibilities and operating requirements before selecting equipment. Ask every supplier to quote against the same layout constraints, utility connections, acceptance tests and maintenance plan. Compare the delivered and installed scope plus documented ongoing costs, not a machine price alone. FeedMatch compares supplier quotes; it is not a builder, engineering contractor or mill operator.
Either route needs qualified site engineers and an accountable operator. Comparing quotes does not transfer construction or safety responsibility to FeedMatch.
| Question | Direct manufacturer or integrator | Independent procurement comparison |
|---|---|---|
| Scope | Agree the chosen supplier's package and exclusions, including subcontracted work. | Set one responsibility matrix for competing offers and compare exclusions and interfaces. |
| Technology and service | Evaluate that supplier's process, documentation and service against your needs. | Compare proposed processes, documentation and service commitments on one operating basis. |
| Construction responsibility | The contracted parties carry responsibilities assigned by contract and applicable law. | The selected contractors still carry those responsibilities; FeedMatch does not design, build or commission mills. |
| Handover | Negotiate acceptance tests, training, manuals and spares directly. | Specify the same acceptance and handover requirements before comparing proposals. |
| Trade-off | One package can simplify coordination, but its exclusions still need review. | More preparation and offers to assess, with clearer scope differences before choosing. |
Calculator results are planning estimates, not engineering designs, quotations or loan offers.
Ready to compare offers? Send a feed mill project request. Requests start at USD 250,000, and a person reviews every request before any manufacturer is contacted. FeedMatch compares supplier quotes; it does not build, sell or finance mills.
A process-line quotation is not automatically a complete building project. Check interfaces from equipment loads to foundations, utility supply to connection points, and delivery to lifting and installation. If a silo quote excludes foundations, ask who provides the loads and who signs off the local structural design. Record the answer rather than assuming 'turnkey' covers it. Your qualified local engineers must confirm site suitability, permits and construction requirements.
Materials must be received, identified, sampled, stored and traced through production. Specify accessible cleaning and inspection points, segregation appropriate to the feeds, and procedures for cross-contamination and non-conforming material. A documented hazard analysis should determine controls and verification. Do not assume heat treatment guarantees every product is safe, or an equipment quotation proves certification. Agree the intended feeds and procedures with the responsible feed-safety team.
Separate installation checks, start-up and performance acceptance in the contract. A no-load run does not establish output or feed quality. Agree reference recipes, sampling methods, utility measurements and remedies for failed under-load tests. Before handover, obtain manuals, drawings, control backups, training records and a spare-parts list. Ask which maintenance tasks require shutdown, what service is actually offered and which parts must be stocked; price written commitments rather than assumed availability.
Equipment TCO compares documented power demand, wear parts, labour and maintenance at a stated production basis. It cannot establish animal feed conversion ratio or guarantee ingredient savings. Formulation, ingredient quality and animal management are separate decisions. Test supplier-supported assumptions against your hours and product mix and keep uncertain inputs visible. FeedMatch does not operate your mill or provide nutritional, engineering or production guarantees.
Feed-safety reference: FAO/IFIF Good practices for the feed sector (2020). Local requirements and your equipment manuals take precedence; this guide is not an engineering or safety specification.
Country guides for farm feed and ingredient buyers in Europe and Asia.
Arabic market pages:
Arabic country guides:
A responsibility matrix covering site design, foundations, buildings, utilities, equipment, installation, commissioning and handover. Each item needs an included, excluded or optional status and a named responsible party. Qualified local professionals must check design and permits. Compare project cost inputs →
Specify the same reference recipes, product sizes, test conditions, throughput and quality criteria, sampling methods and utility measurements. Agree acceptance and remedies in the contract; an empty-machine run is not a production performance test. Compare equipment offers →
Use documented energy, steam or fuel, labour, wear parts, maintenance and downtime assumptions over your planning horizon. Include landed and installed capital costs separately and test uncertain assumptions. These inputs do not guarantee animal FCR or savings. Build a cost comparison →
No. FeedMatch is supplier-neutral and compares quotes; construction, engineering, commissioning and operation remain with your contracted parties and operating team. Project requests start at USD 250,000 and a person reviews every request before any supplier or financier is contacted. Send a human-reviewed request →
Because a machine list fixes the solution before the problem is measured. If the real limit is stops, rework or one section, a full new line may cost far more than needed. Measured outcomes let suppliers quote against the same target. Outcome-first guide →
Improve when output is close to demand and losses come from stops or quality; expand when one section limits the line; build new when demand or the site cannot be met by the existing plant. Compare all three on the same baseline numbers. Outcome-first guide →
Read the electricity meters monthly — per section if they are sub-metered — and divide by tonnes produced in the same period. Keep grinding and pelleting separate when you can, because they usually use the most power. Outcome-first guide →
Yes. For the same retention volume, a deeper bed needs less floor area but pushes air faster through the pellets, which affects fan sizing. Use the cooler sizing calculator and confirm the design bed depth with each supplier. Outcome-first guide →
Write them as measurable results: rated t/h on a named product, pellet quality, temperature after cooling and energy use, tested at the factory (FAT) and again on site (SAT) before final payment. Outcome-first guide →
No. FeedMatch helps you define the outcome, compare suppliers on one scope and prepare for lenders. It does not guarantee savings, performance, prices, supplier terms or loan approval. Outcome-first guide →
No. You submit the request; a FeedMatch team member reviews it, contacts suitable suppliers on your behalf and presents their organized responses to you. The service is free for buyers, for projects of USD 250,000 and above. Outcome-first guide →
No. It is only a headline example. FeedMatch project requests start at US$250,000, and real costs depend on your scope and supplier quotes. Fix, expand or build new →
When one step, poor uptime or quality loss explains most of the gap to target t/h, and the rest of the line has spare capacity. Fix, expand or build new →
When power, steam, intake, space, permits or building condition prevent the target, or when the expansion's cost per tonne over the same period is higher. Fix, expand or build new →
Use the same period, the same tonnes and your own cost per tonne, include downtime during installation, and compare quotes written against one scope. Fix, expand or build new →
It gives a simple undiscounted payback and net result from your figures. For a full return on investment, add discounting, tax and financing cost with your adviser. Fix, expand or build new →
Throughput on named products, pellet durability by ASABE S269, mixer CV, energy per tonne and a test duration, at the factory (FAT) and on site (SAT). Fix, expand or build new →
No. You decide. FeedMatch's team turns your chosen scope into one request, contacts suitable suppliers and presents organized responses. The service is free for buyers. Fix, expand or build new →
Feed mill project requests start at USD 250,000. A person reviews every request before any supplier or financier is contacted. Send a request →
No. FeedMatch is supplier-neutral: it helps you get comparable quotes on one written scope. It does not build mills, sell equipment or lend money. Send a request →
It depends on capacity, product type, automation, buildings, utilities and the site, so there is no reliable single figure. Add up your own supplier quotes on one basis to see the real total. Equipment cost calculator →
Usually because the scope differs: one offer may exclude installation, steel structures, silos or commissioning. Compare line by line and ask each supplier to confirm exclusions in writing. Equipment cost calculator →
Start from annual finished-feed demand, divide by planned operating hours, and allow for downtime and future growth. The result is the tonnes per hour to put in your request. Capacity calculator →
Not necessarily. Pelleting and extrusion rates can vary by recipe, die and conditioning, so ask suppliers which product and conditions their rated capacity refers to. Capacity calculator →
Common routes include your own equity, bank loans, equipment leasing and supplier payment terms. Lenders typically want the budget, quotes, a business plan and security. Test repayments with your own rate and term first. Financing calculator →
The total project budget, your equity share, supplier quotes on one scope, expected feed demand and sales, and the security you can offer. Financing options →
No. They are planning estimates based only on the figures you enter, not engineering designs, quotes or loan offers. Financing calculator →
Calculator outputs are planning estimates, not engineering designs, quotes or loan offers.
The US$250,000 minimum applies only to plant and equipment projects; feed and ingredient purchases have no minimum and are reviewed by our team by specification, volume and destination. FeedMatch reviews and organises your brief before contacting suitable suppliers, then presents responses through FeedMatch—not through direct buyer-to-supplier contact.