See financing options
FeedMatch buyer tools

Landed cost of feed ingredients

Landed cost per tonne is CIF (FOB + freight + insurance) plus import duty, storage and port or inland costs. Enter rates from your own quotes and customs tariff.

Method reviewed: · Enter your own figures — this tool contains no default prices, nutrient values or benchmarks.

Feed ingredient transport and delivery-cost planning

Your inputs

Results

Enter your own figures — this tool contains no default prices, nutrient values or benchmarks.

From landed cost to an ingredient buying brief

A delivered-cost estimate is useful only when the price basis and destination are clear. The ingredient hub's historical export benchmarks are reference observations, not live supplier quotes or delivered prices. Replace reference prices with your own offer and include only the costs you still carry under its delivery term.

Prepare before requesting quotes

  • Ingredient identity, approved specification, quantity and units, packaging or bulk handling.
  • Quote currency, Incoterm and named delivery point; freight, duty and handling supported by your own figures.
  • Lot documents, required delivery date, storage conditions and any costs the offer excludes.

Worked example: 500 t of soybean meal shipped to a farm

A farm group imports 500 tonnes at 420 per tonne FOB, pays 55 per tonne ocean freight, insures at 0.3% of FOB + freight, faces a 5% duty on CIF value, stores for 2 months at 4 per tonne per month and adds 12 per tonne for port, clearance and inland trucking.

Insurance per tonne1.43
CIF per tonne476.43
Duty per tonne23.82
Storage per tonne8
Landed cost per tonne520.25
Total landed cost260,123

The FOB price is only part of the bill: freight, duty, storage and handling add almost a quarter on top (420 FOB becomes about 520 landed). Compare suppliers on this landed figure, on the same Incoterm, not on the FOB price.

All figures are invented to show the method; they are not market prices, quotes or a recommended diet. Use your own quotes and certificates.

Units by country and convention

The calculator works per metric tonne (1,000 kg) in the currency you choose. Convert local units before entering them:

United States
Short ton = 907.185 kg; to get a price per metric tonne, divide the price per short ton by 0.907185. Corn is often quoted per bushel (56 lb = 25.4 kg).
United Kingdom
Feed is usually quoted per metric tonne; the older long ton is 1,016.05 kg.
Brazil
Grains and soy are often quoted per saca of 60 kg: price per tonne = price per saca × 16.67.
India
Quintal = 100 kg: price per tonne = price per quintal × 10.
EU, Latin America, Asia, Africa
Metric tonne is standard. Use duty and VAT rules from your own customs tariff; the tool applies duty to CIF value.

What to do with your result

More buyer questions

Is duty charged on FOB or CIF value?
Most customs regimes that follow WTO valuation charge duty on CIF value (goods + freight + insurance), which is what this tool does. Some countries use FOB; check your national tariff.
Should VAT or GST be included?
Only if you cannot recover it. Recoverable VAT is a cash-flow cost, not a landed cost; enter non-recoverable taxes under duty or other costs.
How do I compare a delivered offer with a FOB offer?
Enter the FOB offer with all freight and import costs, then enter the delivered offer with freight, insurance and duty at zero and only farm-side costs under other. Compare the landed cost per tonne.

What belongs in your feed-operation project file?

Define the production goal before equipment or supplier selection. Buyer procurement is free; FeedMatch structures and reviews the RFQ before supplier outreach and organizes comparable proposals. Commercial mill and equipment projects start at USD 250,000.

  1. Species, production stage, feed form, consumption and volume by product; nutritional specifications approved by a qualified professional.
  2. Capacity by process: receiving, grinding, mixing, pelleting when needed, packing and dispatch; identify expansion interfaces and bottlenecks.
  3. Electricity supply and connected load confirmed by an engineer; document kWh per tonne and tariff, with steam and fuel separate.
  4. Usable storage, stock on hand, delivery lead times, lot segregation and seasonal purchasing/production peaks.
  5. Equipment scope, packaging, freight and named delivery place; quote currency, validity, exclusions and acceptance criteria.
  6. Milestones for site readiness, permits, delivery, installation and commissioning; responsibility and dependencies for each date.

Use dated buyer records, laboratory results and written quotes. Capacity = tonnes/hour × availability × hours/day × days/year; annual averages do not size seasonal peaks. Electricity cost/tonne = kWh/tonne × tariff. Landed cost uses your quote lines; check insurance and customs valuation bases locally. Unknown costs remain pending, not zero. Calculators do not approve diets, engineering or savings.

When can external financing be considered?

After the project and comparable proposals are defined, you may request an optional external review with your consent. FeedMatch is not a bank, lender or credit adviser and promises no approval, terms or returns. No verified Rabobank partnership exists; no lead is automatically sent to a bank. Rabobank’s official pages are background research, not a financing offer for your project.

Official background sources

Shipping route risk: what to add before you compare quotes

As of 14 October 2026, the UK Maritime Trade Operations centre (UKMTO) has reported repeated attacks on tankers and a container ship in and around the Strait of Hormuz, and carriers and shippers are negotiating contracts against that background. If your feed ingredients load in, sail through or discharge in the Gulf, a price quoted before these events may no longer reflect your real cost.

  • Ask each supplier and carrier for written freight, war-risk insurance and surcharges on the date you compare, then enter them in the freight, insurance and other-costs fields.
  • Ask how many extra transit days rerouting or delays could add, and price the extra storage months for that buffer.
  • Check who carries the risk under the Incoterm you agree, and the quote's validity date.
  • This calculator has no live freight or commodity prices; every number comes from you.

Sources (checked 14 October 2026): World Ports Organization, citing UKMTO (13 Oct 2026) · Sourcing Journal (13 Oct 2026). Conditions change daily; recheck before you order.

Questions

Is duty always charged on CIF?
Many customs regimes value imports on CIF, but some use FOB or add other charges. Confirm the basis with your customs broker.
Does the tool include VAT or currency conversion?
No. Enter all amounts in one currency; recoverable VAT and FX are excluded.
WhatsApp