Lysine RFQ
Request a lysine quote — L-Lysine HCl 98.5% and lysine sulphate
Lysine is the highest-volume crystalline amino acid in most rations and the easiest place to lose margin to a poorly written enquiry. Give us the salt form, assay, volume and delivery terms and we issue a structured RFQ to qualified producers and distributors, then compare every offer on delivered cost per unit of lysine.
- L-Lysine HCl 98.5% and lysine sulphate 70%
- Normalised cost per unit of lysine
- Container and bulk volumes
- Free for buyers — supplier-neutral
What a complete lysine (hcl / sulphate) RFQ must contain
- Salt form and guaranteed lysine content
- Tonnage per shipment and per year
- Packaging (25 kg / big bag / bulk)
- Incoterm, discharge port and inland delivery
- Required certifications and origin restrictions
- Payment terms and price validity window
Frequently asked questions
Is lysine sulphate cheaper than L-Lysine HCl?
Per tonne of product, usually yes — but sulphate carries roughly 70% lysine against 78.8% for HCl, plus fermentation co-products that add crude protein and sulphur to the ration. The only valid comparison is delivered cost per unit of lysine at your inclusion rate, with the formulation matrix adjusted for the additional nutrients the sulphate form contributes.
What is the minimum order quantity for lysine?
Producers normally quote from one full container (about 25 t bagged) and price improves materially at multi-container and vessel volumes. Smaller quantities are served through regional distributors. Your request is routed to the appropriate supplier tier automatically.
How long are lysine offers valid?
Typically 3–7 days for spot business and longer for contracted volumes, because the market is fermentation-capacity and freight driven. Offers returned through FeedMatch carry a stated validity date so you can compare on the same day rather than across a moving market.
Can I contract lysine forward?
Yes. Quarterly and annual framework contracts with monthly call-offs are standard for mills with stable throughput and usually price below repeated spot buying. Indicate a framework requirement in the timeline field and suppliers will quote both structures.
