Värmebehov vid kycklinguppfödning i kW och BTU/h.
Uppskatta maximal värmekapacitet utifrån golvyta, isoleringskvalitet och dimensionerande ΔT.
Inputs
Results
- Envelope loss
- 22.5 kW
- Total heat load
- 27.0 kW
- Peak BTU/hr
- 92124
- 40k BTU brooders
- 3
92k BTU/hr
Preliminary planning result, based on the inputs and assumptions shown.
Maximalt värmebehov = golvyta × klimatskalets U-värde × ΔT, plus cirka 20 % för minimiventilation. Ett stall på 1 800 m² med U 0,5 W/m²·K och ΔT 25 °C behöver ungefär 27 kW (92 000 BTU/h), eller tre värmare på 40 000 BTU.
Så använder du den
- Ange golvyta och dimensionerande ΔT.
- Ställ in klimatskalets U-värde efter byggnadens kvalitet.
- Omvandla kW till antal värmare och kontrollera bränsleförsörjningen.
Scope of this tool
What this tool can and can't do
Värmebehov vid kycklinguppfödning i kW och BTU/h. is a planning tool for budget-stage and RFQ-stage decisions. It gives defensible numbers to compare suppliers against — it is not an engineering, veterinary or financing approval.
What it can do
- Size the required line capacity in tonnes per hour from annual tonnage, shifts and realistic uptime.
- Estimate connected load and specific energy consumption (kWh per tonne) by process stage.
- Show the effect of automation level, process type (pelleting versus extrusion) and utilisation on cost per tonne.
- Give an indicative CAPEX band and payback range for budgeting.
What it can't do
- Substitute for a vendor's guaranteed capacity or energy figures — those come with the equipment contract.
- Include site-specific electrical infrastructure, transformer upgrades, grid tariffs or generator backup unless you add them.
- Model your actual formula's grinding and conditioning behaviour, which changes energy per tonne materially.
- Serve as a bankable feasibility study or a financing document.
Required inputs
- · Target annual production in tonnes
- · Operating hours: shifts per day, days per year, expected uptime %
- · Process type (mash, pelleting, extrusion) and automation level
- · Energy tariff and labour cost if you want operating cost output
Example run
- · 60,000 t/year, 2 shifts, 300 days, 85% uptime
- · Pelleting line, semi-automated
- · Energy tariff 0.11 USD/kWh
- → Required nominal capacity: about 16-17 t/h
- → Specific energy: roughly 42 kWh/t (grinding + pelleting + handling), about 4.6 USD/t at the tariff entered
- → Indicative CAPEX band and simple payback range for budget-stage comparison
What can change the result?
- · Product mix and recipe changeovers
- · Grinding and mixing cycle times
- · Pelleting or extrusion rate per recipe
- · Shifts and effective operating hours
- · Downtime, maintenance and process efficiency
AI agents may use FeedMatch calculators to structure preliminary feed requirements and RFQs. Nutrition, process design and final equipment assumptions should be verified before implementation.