Project Preparation
Feed Mill Project Checklist
Everything to prepare before requesting quotations for a new feed mill or a major upgrade: capacity, site, process scope, permits, budget and commissioning criteria. Work through the seven sections, then send one structured RFQ so supplier proposals arrive on a comparable scope.
1. Define capacity and products
- Target capacity in tonnes per hour and expected annual operating hours
- Feed types and forms: mash, pellets, crumbles, extruded; species and production stages served
- Raw material list and typical inclusion rates from your nutritionist's formulations
- Finished-product packaging: bulk, bags, big-bags; dispatch rhythm per day
2. Site, utilities and civil works
- Land secured or identified, with access for trucks and, where relevant, rail or port
- Power supply capacity, water, steam or fuel source, and drainage
- Building footprint, ceiling heights and floor loading for towers and silos
- Climate conditions that affect drying, cooling and storage design
3. Process route and equipment scope
- Intake, cleaning and storage: pits, conveyors, silos and raw-material cover days
- Grinding, dosing and mixing lines sized to the target capacity
- Pelleting or extrusion line with conditioning, drying and cooling
- Packing, palletizing and finished-goods storage; laboratory and quality equipment
- Automation level, control system and spare-parts package
4. Permits, standards and compliance
- Local construction and environmental permits required for the site
- Feed-safety and quality standards the plant must meet in its market (for example GMP+, ISO 22000 or FAMI-QS where applicable)
- Import rules for equipment and any restricted items at the destination
- Confirm requirements with the competent local authorities — FeedMatch does not certify or approve projects
5. Budget and financing preparation
- Total investment budget band, split into equipment, civil works, installation and working capital
- Own funds versus third-party financing; financing is provided by independent providers, subject to their approval
- Realistic ramp-up plan: months to reach planned utilization
- Operating-cost estimate per tonne from your own energy, labour and maintenance figures
6. RFQ and supplier comparison
- One structured RFQ sent to every candidate supplier on an identical scope
- Scope inclusions and exclusions stated line by line, with installation and commissioning defined
- Delivery basis (Incoterm), timeline, payment terms and offer validity stated up front
- Compare offers on total cost of ownership, not the quoted equipment price alone
7. Delivery, installation and commissioning
- Delivery schedule with milestones and responsibility for transport and insurance
- Installation and supervision scope: who builds, who supervises, who provides cranes and labour
- Factory and site acceptance tests (FAT/SAT) with agreed capacity and quality criteria
- Training, documentation, warranty terms and after-sales service arrangements
Feed mill project checklist — common questions
What is a feed mill project checklist?
A structured list of every input needed to scope a feed mill project before requesting quotations: capacity and products, site and utilities, process route and equipment scope, permits, budget, and delivery and commissioning criteria. It lets suppliers quote against the same complete brief instead of exchanging scattered emails.
What should a feed mill RFQ include?
Target capacity in tonnes per hour, feed types and forms, raw materials, site and utilities, the equipment scope with inclusions and exclusions, automation level, delivery terms and timeline, and acceptance-test criteria. The RFQ templates on this site walk through each field.
Is this checklist free to use?
Yes. The checklist and the buyer tools on this site are free for commercial buyers. FeedMatch is an independent sourcing platform, not an equipment manufacturer or EPC contractor; suppliers are contacted only after the FeedMatch team reviews a request.
FeedMatch Group is an independent, supplier-neutral sourcing platform. It is not an equipment manufacturer, EPC contractor or lender, and it does not guarantee supplier availability, prices or project outcomes. Plant and equipment projects are reviewed from a USD 250,000 qualification minimum; the team reviews every request before any supplier is contacted.