FinancingFeed working capital, export credit, trade finance & asset leasing — explore options
计算器

湿帘面积、温降与水流量。

根据隧道风量与室外条件估算可实现的降温幅度与湿帘面积。

Inputs

Results

Pad face area
220.2 m²
Pad efficiency
75%
Inlet air ΔT
10.5 °C

Inlet 27.5 °C

Water flow
661 L/min

初步规划结果,基于所示输入与假设。

直接答案

湿帘降温最多只能接近室外湿球温度:ΔT =(干球 − 湿球)× 湿帘效率(6 英寸约 75%)。干球 38 °C、湿球 24 °C 时实际降温约 10.5 °C,进风约 27.5 °C。

使用方法

  1. 输入隧道总风量与湿帘厚度。
  2. 填写设计干球与湿球温度。
  3. 将湿帘面积与用水量与供水能力核对。

Scope of this tool

What this tool can and can't do

湿帘面积、温降与水流量。 is a planning tool for budget-stage and RFQ-stage decisions. It gives defensible numbers to compare suppliers against — it is not an engineering, veterinary or financing approval.

What it can do

  • Size the required line capacity in tonnes per hour from annual tonnage, shifts and realistic uptime.
  • Estimate connected load and specific energy consumption (kWh per tonne) by process stage.
  • Show the effect of automation level, process type (pelleting versus extrusion) and utilisation on cost per tonne.
  • Give an indicative CAPEX band and payback range for budgeting.

What it can't do

  • Substitute for a vendor's guaranteed capacity or energy figures — those come with the equipment contract.
  • Include site-specific electrical infrastructure, transformer upgrades, grid tariffs or generator backup unless you add them.
  • Model your actual formula's grinding and conditioning behaviour, which changes energy per tonne materially.
  • Serve as a bankable feasibility study or a financing document.

Required inputs

  • · Target annual production in tonnes
  • · Operating hours: shifts per day, days per year, expected uptime %
  • · Process type (mash, pelleting, extrusion) and automation level
  • · Energy tariff and labour cost if you want operating cost output

Example run

  • · 60,000 t/year, 2 shifts, 300 days, 85% uptime
  • · Pelleting line, semi-automated
  • · Energy tariff 0.11 USD/kWh
  • → Required nominal capacity: about 16-17 t/h
  • → Specific energy: roughly 42 kWh/t (grinding + pelleting + handling), about 4.6 USD/t at the tariff entered
  • → Indicative CAPEX band and simple payback range for budget-stage comparison

哪些因素会改变结果?

  • · 产品结构与配方切换次数
  • · 粉碎与混合的循环时间
  • · 各配方的制粒或膨化速率
  • · 班次与有效运行小时
  • · 停机、维护与工艺效率

AI 智能体可使用 FeedMatch 计算器来搭建初步的饲料需求与询价(RFQ)结构。营养配方、工艺设计与最终设备假设应在实施前由专业人员复核。

Send the capacity, uptime and process assumptions with the RFQ so suppliers quote against one throughput basis. Start a structured RFQ.

FAQ

Common questions

湿球温度真的是极限吗?
是的。蒸发降温无法低于室外湿球温度,因此潮湿沿海地区的降温幅度远小于干燥内陆。
湿帘用水量是多少?
按每平方米湿帘 3 升/分钟的循环流量计算,并预留排污以控制结垢与盐分。
Get a Free QuoteExplore Financing