Construction & EPC Delay

Risk that construction and commissioning slip beyond planned commercial operation date (COD), delaying revenue and increasing financing cost.

Audience: Buyer · Lender

When this guide applies

Greenfield poultry houses, hatcheries, feed mills and processing plants — any project with an EPC or turnkey contract.

Add to RFQ draft

Auto-fill mitigation & clause text into your RFQ

Select the risks you want covered. We'll pre-populate the RFQ description with the mitigations and paste-ready contract clauses — you can edit anything before submitting.

Mitigations + clauses will be inserted into the RFQ draft on the next step.
Interactive risk checklist

Tick the mitigations already in your plan

Coverage is severity-weighted, so covering a Critical risk moves the score more than a Low one.

Readiness score
0%
Early stage
0 of 9 mitigations · weighted 0/30
Site conditions differ materially from geotechnical assumptions High · Medium
Late equipment delivery blocks commissioning High · High
Permits and utility connections delayed beyond project schedule Critical · Medium

Site conditions differ materially from geotechnical assumptions

Severity: HighLikelihood: Medium
Impact: Foundation redesign, cost overrun 5–15% of civils budget
Mitigations
  • Commission an independent geotechnical survey before EPC contract signature — not after
  • Contract price is fixed except for a defined ground-conditions clause with quantified thresholds
  • Contingency of 5–10% of civils budget held by buyer, not EPC
RFQ / contract clause

"Ground conditions are treated as employer's risk only where they differ from the geotechnical baseline attached as Annex G. All other conditions are contractor's risk within the fixed price."

Late equipment delivery blocks commissioning

Severity: HighLikelihood: High
Impact: Idle civils, idle labour, deferred COD, loss of first placement window
Mitigations
  • Liquidated damages: typically 0.1–0.2% of contract value per day of delay, capped at 10%
  • Milestone dates for drawings, FAT, shipment and site acceptance — each with LDs, not just final COD
  • Long-lead items (breeder cages, evisceration lines, incubators) ordered before ground-breaking
RFQ / contract clause

"Liquidated damages for delay shall accrue at 0.15% of Contract Price per calendar day, capped at 10% of Contract Price, and shall be a genuine pre-estimate of the Employer's loss, not a penalty."

Permits and utility connections delayed beyond project schedule

Severity: CriticalLikelihood: Medium
Impact: Cannot operate even when facility is complete
Mitigations
  • Permit-tracking register maintained by buyer with named owner per permit
  • Utility connection (grid, water, gas) applied for at design freeze, not at commissioning
  • Diesel/LPG backup and water storage sized for 4 weeks of independent operation
RFQ / contract clause

"Utility connections and statutory permits are Employer's risk. EPC Contractor shall provide the technical documentation required for each application within the schedule set in Annex P."

Related references

→ Construction cost planner

Other risk guides

Procurement & contract
Supplier Default & Non-Performance
Biosecurity & health
Biosecurity & Disease Outbreak
Market & commercial
Market & Off-Take
Next steps
Equipment: capacity, installation & OPEX Additives: lot quality & logistics Prepare a managed RFQ External financing review Calculators
FeedMatch Group logo — wheat sheaf and interlocking chevrons emblem representing the independent animal feed procurement and ingredient intelligence platform
FeedMatchGroup

Because we care more.

Global animal feed & ingredient procurement. Supplier-neutral sourcing of feed and raw materials for farms, integrators, feed mills and importers worldwide.

Follow us on LinkedIn
Chat with our team on WhatsApp+44 7936 808834
Language

Feed Procurement

  • Request a Feed RFQ
  • Get a Free Quote
  • Feed Procurement
  • Feed Procurement Platform
  • Commercial Procurement
  • Buyer's Guide
  • Tenders & Institutional Bids
  • Supplier Sourcing
  • Landed Cost by Trade Lane
  • Logistics & Freight

Feed & Ingredients

  • Feed Ingredients
  • Premixes, Additives & Feed-Grade Products
  • Feed by Species
  • Feed by Production Stage
  • Specification Library
  • Standards Library

Calculators & Tools

  • Innovation & Technology
  • Calculators & Tools
  • Free Project Planner
  • Feed Mill Operating Costs
  • Feed Mill Energy Calculator
  • Feed Mill Calculator

Company

  • About FeedMatch
  • How It Works
  • Buyer Intelligence
  • Become a Supplier
  • FAQ
  • Global B2B Group Network
  • Contact
  • Sitemap
Global B2B Group — Our Network

Specialist platforms of Global B2B Group, the parent marketplace for agricultural and food commodities. Explore the full network →

  • HatchMatch — Poultry
  • FishMatch — Aquaculture
  • ColdMatch — Cold Chain
  • SeedMatch — Seeds & Inputs
  • Visit: FishMatch · HatchMatch · SeedMatch · ColdMatch · Global B2B Group

FeedMatch Group is a human-led, supplier-neutral B2B procurement service for commercial animal-feed, feed-ingredient and feed-mill project buyers. Feed-mill plant and equipment projects start from USD $250,000; feed and ingredient supply requests are reviewed by specification, volume, destination and logistics. Every request is reviewed by our team — suppliers are contacted only after authorized human review.

FeedMatch Group is the specialized animal feed and feed-ingredient procurement platform of Global B2B Group. FeedMatch Group is not a feed manufacturer, ingredient trader, commodity trader, distributor, broker, feed mill, nutritionist, veterinarian, EPC contractor, lender, bank, credit provider, financial advisor, investment advisor, insurer or underwriter. Any financing, leasing, trade finance, working capital or project-finance option mentioned on this website is provided solely by independent third-party financing providers, subject to their own eligibility checks, KYC, due diligence, compliance review, approval, terms and documentation. FeedMatch Group prepares project information and may introduce independent providers only with separate explicit consent. Legal classification requires jurisdiction-specific counsel review. FeedMatch does not guarantee financing approval, and is not responsible for any financing decision, offer, rejection, delay, cost, term or outcome. Quotes, feed, ingredients, additives, equipment, logistics, services, warranties, feed safety, nutritional outcomes, FCR and animal performance remain solely the responsibility of independent third-party suppliers, manufacturers, logistics providers or qualified professionals. See Terms and Disclaimer.

FeedMatchGroup.com · Global Animal Feed & Ingredient Procurement
Privacy·Terms·Buyer Terms·Supplier Terms·RFQ Terms·Cookies···Privacy requests·Confidentiality & security·Disclaimer·Legal Center·Accessibility·Accessibility Support·Contact·Sitemap
Privacy & Compliance· Status and your rights© 2026 FeedMatch Group · feedmatchgroup.com · All rights reserved.Earth with a sprouting seed — our responsibility commitmentWe support animal welfare, appropriate nutrition and good care conditions for animals, and practical environmental sustainability. As a group commitment, 2% of our profits will be invested in initiatives supporting the planet and animals.FeedMatch Group is the specialized animal feed and feed-ingredient procurement platform of Global B2B Group. FeedMatch prepares procurement project information; it does not manufacture feed or equipment or make credit decisions. Financing-provider availability and relationships are not verified. Any future introduction requires separate explicit consent and jurisdiction-specific legal review. Operated from the Republic of Cyprus.Built for commercial animal-feed procurement — feed mills, integrators, importers, EPCs, governments and industrial farms. The USD 250,000 minimum applies only to plant and equipment projects, not to feed or ingredient purchases. Not intended for hobby, backyard, pet-owner or small retail purchasing. How FeedMatch works.FeedMatch Group is a specialized platform of Global B2B Group — the parent group and buyer-first marketplace for agricultural and food commodity sourcing. Sister platforms: HatchMatch Group, ColdMatch Group, FishMatch Group, SeedMatch Group.The specialized feed platform within the Global B2B Group ecosystem.
CalculatorsGuidesFinancingRequest a Quote
WhatsApp

FeedMatch prepares procurement project information and, only with separate explicit consent, may introduce it to independent providers. Procurement is free for buyers and supplier-funded. FeedMatch performs no underwriting, pre-approval, offer or credit decision. Legal classification requires jurisdiction-specific counsel review.