Buyer Checklist

Buyer Checklist. Estrutura prática para compradores de ração: fornecedores verificados, RFQ, Incoterms e gestão de riscos. Approaching suppliers before your…

The pre-RFQ buyer checklist — Procurement · Checklist — FeedMatch Group project reference
Procurement · Checklist

The pre-RFQ buyer checklist

Approaching suppliers before your site, permits and financing are locked down wastes time and burns credibility. Use this checklist as your gate: only issue an RFQ once every item is a yes.

  • Site readiness
  • Permits & compliance
  • Financing
  • Technical scope
Project references

Visual scope of procurement · checklist

Site & infrastructure

Land title clear, access road, grid connection, water source tested, drainage plan, biosecurity buffer distance confirmed.

Permits & compliance

Zoning approval, environmental impact study (where required), veterinary permit, construction permit, waste management plan.

Financing

Own equity confirmed, bank pre-approval or ECA/DFI letter of interest, incoterm consistent with LC or T/T capacity.

Technical scope

Bird type and capacity fixed, technology envelope chosen (cage-free vs caged, tunnel vs cross), integrator vs multi-vendor decision made.

17 options

Tells suppliers how mature the requirement is and how to structure their quote.

Select the bracket that best matches your allocated or anticipated budget. This helps us route the RFQ to suppliers with the right project capacity.

Pick all that apply.

If you already have suppliers or equipment brands in mind, list them (comma-separated). We benchmark them against comparable qualified alternatives — vendor-neutral, no lock-in.

House size, climate zone, production target, equipment standards, Incoterms, warranty terms, or any must-have scope items. The more specific, the more comparable the quotes.

When do you need supplier proposals back? We align outreach and reminders to this date.

💬 Anything else? (pick all that apply)
📝 Project description (optional — helps suppliers quote faster)

Free for buyers · Supplier-paid model · No obligation · Human-assisted sourcing

Most buyers receive initial supplier matches within 24–72 hours.

FAQ

Common questions

Como Buyer Checklist se aplica ao meu programa de compras?
Adaptamos a estrutura ao seu volume anual, número de fornecedores, mercados de origem e Incoterms preferidos. A primeira reunião define KPIs, cronograma e fornecedores-alvo.
Quanto tempo até ver economia com esta abordagem?
Os primeiros benchmarks surgem em 2–3 semanas; economias contratuais sustentáveis costumam se consolidar entre o T1 e o T2 após adotar um RFQ estruturado.
Como se garantem qualidade e rastreabilidade?
Exigimos GMP+/FAMI-QS, COA por lote, controle de micotoxinas e auditoria documental antes de homologar qualquer fornecedor.
Oferecem apoio em financiamento e Incoterms?
Sim — LC, seguro de crédito, ECA e estruturação CIF/CFR/DAP conforme o destino, sujeito a aprovação de bancos e seguradoras.