Buyer FAQ hub
Four question sets cover most of what buyers ask us before a project brief is written. Every answer is general planning guidance; your own figures come from the calculators, and every requirement is reviewed by a person before any supplier is approached.
Feed buyers usually need four things settled before they brief a project: a formula target (species, stage, target weight gain and feed conversion ratio) verified by a qualified animal nutritionist; a financing route (working capital, trade finance, equipment leasing, asset-backed lending, export credit or project finance); an equipment cost estimate built from capacity, process route, storage and scope; and a realistic project timeline covering engineering, civil works, manufacturing, shipping, installation, automation and commissioning. FeedMatch reviews each requirement with a person before approaching any supplier, does not publish prices or supplier claims, and is not a lender, feed manufacturer, trader or nutritionist.
Planning aids for sizing a requirement — never a final formulation.
No. FeedMatch is not a nutritionist and does not publish formulations. The formula calculator turns species, stage, target weight gain and feed conversion ratio into tonnage and landed-cost planning figures so you can brief a supplier. Any final formulation must be issued and signed off by a qualified animal nutritionist.
Species and production stage, number of animals or batch size, target weight gain, expected feed conversion ratio, and your own cost inputs for ingredients, freight, duty and handling. Nothing is pre-filled with market prices, so the output reflects your figures only.
Use your own historical closing data for the same species, stage, genetics, climate and management. Where you have no history, run the calculator across a range rather than a single value and treat the band as a planning envelope, then have a nutritionist confirm it.
Yes. Species, stage, tonnage, feed conversion ratio and landed-cost assumptions carry into the reviewed request so you do not retype them. A person reads the request before any supplier is contacted.
Evaluation and introduction only — FeedMatch is not a lender.
No. FeedMatch is not a lender, bank or credit provider. Where relevant, reviewed projects can be introduced to independent financing providers, subject to their own assessment and approval. Financing is never guaranteed.
Commonly working capital facilities, trade finance and letters of credit, equipment leasing, asset-backed lending, export-credit backed finance and project finance for larger builds. The financing guide explains what each one suits and the indicative tenor ranges published by the market.
Typically company and ownership details, audited or management accounts, the project scope and budget, offtake or sales evidence, collateral or guarantees, and the destination and regulatory context. Prepare these before you request an introduction.
The financing guide is published for several markets and languages, and each country page links its local edition. Availability of any instrument depends on the provider, not on FeedMatch.
Cost structure you build from your own inputs — no published price benchmarks.
Build capital cost up from capacity in tonnes per hour, process route (pelleting or extrusion), intake and storage, dosing, grinding, mixing, cooling, coating, packaging, automation level and the civil and installation scope. The cost calculator lets you enter your own rates and returns a breakdown and a planning band.
No. Prices depend on configuration, supplier, origin, delivery terms and timing, and publishing indicative prices would mislead. You enter your own cost assumptions; formal figures come from quoted offers after a reviewed request.
Scope. One may exclude civil works, steel structure, electrical installation, commissioning, spares or training while the other includes them. Compare scope line by line before comparing totals, and check whether capacity is nameplate, guaranteed or average.
Civil and foundation works, the building envelope and height for an extrusion line, electrical supply and transformer capacity, dust and fire safety, spares, freight and duty, installation labour, commissioning, training and working capital for the first production runs.
Planning durations, not commitments — suppliers confirm their own schedules.
Plan in phases: engineering and layout, permitting, equipment manufacturing, shipping, civil works, mechanical installation, electrical and automation, commissioning and handover. Several phases overlap, and manufacturing plus shipping usually drive the critical path. Use the timeline page to build a phase plan and have each supplier confirm their own durations in writing.
Late civil works and foundations, incomplete electrical supply, permits, unclear scope splits between supplier and buyer, changes to the process route after ordering, and shipping or customs on the destination side.
Early. Financing assessment usually runs in parallel with engineering, because payment milestones are set at order and providers need the scope, budget and evidence before equipment is released for manufacturing.
Often yes — for example commissioning a mash line first and adding pelleting, coating or extrusion later. Phasing must be designed in from the start: building height, foundations, electrical capacity and space for the later line are hard to retrofit.
This page is also available in other languages.
FeedMatch Group is an independent, supplier-neutral procurement platform. It is not a lender, feed manufacturer, commodity trader, distributor, nutritionist, veterinarian or bank. Calculator outputs are planning aids to be verified by a qualified animal nutritionist and by quoted supplier offers. Introductions are made only after human review.